Fire Pump Controller Scheduler

FIRE PUMP CONTROLLER SCHEDULER

Display

Description

 

           START    STOP

MO       - -:- -        - -:- -

TU        - -:- -        - -:- -

WE       - -:- -        - -:- -         

 

TH       - -:- -        - -:- -  

FR       - -:- -        - -:- -

SA        - -:- -        - -:- -

SU       - -:- -        - -:- -         

- -:- - = HH:MM

(Example 08:30)

You can set up the time to start / stop automatically the engine on specific days of the week. You are required to set up the date and time of the internal clock (see 5.0) before setting up the scheduler. If you fail to set up the clock, the [CLOCK ERROR WARNING] alarm will take place (see secion 33.0).                             

Follow the instructions:

 

Use [ ↑ ] or [ ↓ ] to select a day of the week. Push [→] to enter the START field.

Use [→], [ ↑ ] and [ ↓ ] to set HH:MM. Push [→] to enter the STOP field. Use [→], [ ↑ ] and

 [ ↓ ] to set HH:MM. Repeatedly push [←] to return to the day selection. Do the same in case you want set up additional day(s) of the week. Push  [←] to exit.

 

The Scheduler triggers a test only in AUTO mode of operation. The 'Status Page' displays, for a short time, the programmed Day/Time every 10 seconds. The yellow LED AUTO will blink during the test. In NFPA /EN applications, take care to program the automatic shut down accordingly.